Friday, March 11, 2011

Friday Update from the Construction Site

3/11 - Both inspections schduled for today passed.
Next week:
3/14 – Backfill
3/15 – Slab Prep
3/16 -  Pour Slab (Slab Prep Inspection to follow soon after)  
3/16 – Lumber arrives on site
3/17 – Framing Begins