Friday, March 18, 2011

Framing Day 1

Images from the first day of framing.


Ryan Homes, Venice Model, Framing Day 1
Front View, Garage Entrance on Left
Side View

Thursday, March 17, 2011

Lumber Has Been Deliever

Lumber, Venice Model

Entire lumber kit for Venice Model.  Delievered on Wednesday, framing started today.

Lumber, notations indicating which lot
Lumber, with some walls already framed
Ryan Homes, Lumber Delievery
Load Check Tag
Steel Beams

Wednesday, March 16, 2011

Concrete Slab Has Been Poured

The parking pad, and basement floor have been poured.  Very, very, exciting!
Parking Pad, Concrete Slab

Parking Pad, Poured Concrete Basement Floor

View Standing in Front of Garage


View Into Basement


3 Piece Rough-In for Bathroom

Sump Pump




Clean out on Right

Morning Room



Tuesday, March 15, 2011

Backfill & Slab Prep

Here are pictures that show the current progress on my lot.

Parking Pad, Slab Prep
Parking Pad, Slab Prep
Parking Pad, Slab Prep
Basement, Slab Prep, 3 Piece Rough In
Basement, Slab Prep
Front Exterior Wall, Backfill, Slab Prep
Basement Slab Prep, Sump Pump
Basement Slab Prep
Basement, Slab Prep
Basement, Backfill, Slab Prep

Sunday, March 13, 2011

Tip #5: Permits, Approvals, and Inspections

In Baltimore County you can view scheduled and completed inspections online.  So I'm able to see what inspections have been scheduled, and what the result is.  We're set to start framing on Thursday, and so far three inspections have been completed.  Each inspection passed.  But this is great for me, as I like to be in the loop with as much as possible.

It's important to know that all these inspections lead up to the most important part of the process for the builder, which is to be approved for the 'Occupancy and Use Permit.'  Which basically means its now a legal residence, and they can then sell it as a house ready to be lived in. 

Also note, that these permits are for code compliance.  So inspectors are looking to see if work done complies with local codes.  This differs from what a home inspector would look for.  As they look at many things including safety items, quality of construction methods, ect.

For those in Baltimore County, you can also view your permits online.  You'll only need the link, which I'm providing, and your permit number.  That can be found on your Master Selection Sheet.

Lastly, to learn more about building codes, you can always check out a Building Code Guide, like one from Dewalt, shown in picture. 

http://www.baltimorecountymd.gov/Agencies/permits/inspectionconnection/index.html

http://www.baltimorecountymd.gov/Agencies/permits/index.html

Saturday, March 12, 2011

Final Rough Plumbing Pictures Before Slab Prep Begins

Rough plumbing pictures, and a shot of Baltimore County Inspection sticker.
3 Piece rough in plumbing
In ground plumbing
In ground plumbing
Under Slab plumbing
Basement Rough Plumbing

Friday, March 11, 2011

Backfill, Compaction, and Settling

Today I emailed our PM three questions.  They were:


-What material are you using for backfilling?
-How would you rate the density of the backfill material?
-What method do you use to ensure proper compaction aroundthe exterior of the basement walls?



He was very prompt in his reply:


He said they use dirt from the excavation as backfill material.  The dirt does get air pockets that over a period of time will work they’re way out, usually after rain.  Some settlement around the foundation during the construction process is common.  Ideally we wont get any settlement after the house is finished, but if we do, Ryan will come back and fix it.  He said its much more common in houses built over the summer due to the dry climate and dirt. 

These questions steam from seeing settling at the model home in our community.