skip to main
|
skip to sidebar
Ryan Homes Reviews
Showing posts with label
lumber
.
Show all posts
Showing posts with label
lumber
.
Show all posts
Thursday, March 17, 2011
Lumber Has Been Deliever
Lumber, Venice Model
Entire lumber kit for Venice Model. Delievered on Wednesday, framing started today.
Lumber, notations indicating which lot
Lumber, with some walls already framed
Ryan Homes, Lumber Delievery
Load Check Tag
Steel Beams
Friday, March 11, 2011
Friday Update from the Construction Site
3/11 - Both inspections schduled for today passed.
Next week:
3/14 – Backfill
3/15 – Slab Prep
3/16 - Pour Slab (Slab Prep Inspection to follow soon after)
3/16 – Lumber arrives on site
3/17 – Framing Begins
Older Posts
Home
Subscribe to:
Posts (Atom)
Followers
Blog Archive
▼
2011
(25)
▼
March
(25)
Pre Drywall Meeting
Framing Day 11 - Roof Complete, Pictures of the Ba...
Framing Day 10 - Roof Goes On
Framing Day 5 - Doors and Windows
Tip #6 – If the house isn’t built right, don’t buy...
Framing Day 4
Framing Day 2
Framing Day 1
Lumber Has Been Deliever
Concrete Slab Has Been Poured
Backfill & Slab Prep
Tip #5: Permits, Approvals, and Inspections
Final Rough Plumbing Pictures Before Slab Prep Begins
Backfill, Compaction, and Settling
Friday Update from the Construction Site
Inspections Set for Tomorrow
3/9 In Ground Plumbing Started
3/8 Pic's
3/2/2011-3/6/2011
3/4-PM (Project Manager) Update, Approximate Timel...
Tip #3 – HomeSafe (the low voltage wiring guys)
Tip #4 – Discuss then Document. Discuss then Docu...
Tip #2 - Select Your Options Carefully...(then sta...
Tip #1 - Get Your Own Real Estate Agent
The Basics of Our Deal
About Me
tbeem1
View my complete profile