Showing posts with label lumber. Show all posts
Showing posts with label lumber. Show all posts

Thursday, March 17, 2011

Lumber Has Been Deliever

Lumber, Venice Model

Entire lumber kit for Venice Model.  Delievered on Wednesday, framing started today.

Lumber, notations indicating which lot
Lumber, with some walls already framed
Ryan Homes, Lumber Delievery
Load Check Tag
Steel Beams

Friday, March 11, 2011

Friday Update from the Construction Site

3/11 - Both inspections schduled for today passed.
Next week:
3/14 – Backfill
3/15 – Slab Prep
3/16 -  Pour Slab (Slab Prep Inspection to follow soon after)  
3/16 – Lumber arrives on site
3/17 – Framing Begins