Framing nearly complete. HVAC roughed in. Electical and plumbing are being worked on today and tomorrow. My independent inspection is Wednesday. Pleantly of pictures, take a look.
Showing posts with label construction site. Show all posts
Showing posts with label construction site. Show all posts
Monday, March 28, 2011
Friday, March 11, 2011
Friday Update from the Construction Site
3/11 - Both inspections schduled for today passed.
Next week:
3/14 – Backfill
3/15 – Slab Prep
3/16 - Pour Slab (Slab Prep Inspection to follow soon after)
3/16 – Lumber arrives on site
3/17 – Framing Begins
Subscribe to:
Posts (Atom)